+61 478 823 730

  • Home
  • SERVICES
  • OUR PROJECTS
  • CASE STUDIES
  • FAQs
  • Contact Us
  • REFERRALS
  • More
    • Home
    • SERVICES
    • OUR PROJECTS
    • CASE STUDIES
    • FAQs
    • Contact Us
    • REFERRALS

+61 478 823 730

  • Home
  • SERVICES
  • OUR PROJECTS
  • CASE STUDIES
  • FAQs
  • Contact Us
  • REFERRALS

TWO MILE HOTEL

This is an exceptional example of how powering your business with solar can substantially reduce operating costs. After installing a 72kW solar PV system at Two Mile Hotel, we reduced energy costs by 82%, saving on average $2200 a month! We are now looking to install batteries on the system to maximize energy use and reduce demand costs. 

BEFORE SOLAR

Power bill = $4,400/month 

SOLAR SOLUTION

72kW solar PV system  with 60kW inverters

Total project cost =  $60,000  (after STC rebate) 

Estimated payback period = 2 years

AFTER SOLAR

Power bill = $566/month

ROI = 73%

Current payback period = 1.4 years

Lee Christensen, Two Mile Hotel

 " Very happy with my experience with SunSpark for the supply and installation of my 72kW solar system. I would recommend SunSpark to any business that is considering getting solar. David put in a lot of effort to ensure we were informed and satisfied right from start to finish. "

BEFORE SOLAR

AFTER SOLAR

Copyright © 2018 SunSpark Solar Services ABN 52 631 621 362 - All Rights Reserved.


TERMS AND CONDITIONS


Powered by